Grounds: Slope, drainage
Structural: Foundation, floors and walls
Exterior: Siding, decks, windows, etc.
Roof: Covering, chimney, flashings, etc.
Plumbing: Supply, piping, fixtures and water heating equipment
Electrical: Service entrance, main/sub panels, wiring, receptacles
and switches
Heating/Air Conditioning: Operation, venting, distribution, etc.
Interior: Ceilings, floors, walls, doors, stairs, windows
Insulation: Attics, floors, walls
Ventilation: Kitchen, bathrooms
(Typically 3 -4 hours for inspection)
Digital photographs of any issues found during
the inspection, including gas and water main shut-offs.
Matrix (checklist/narrative) report and binder - delivered within 24 hours
of inspection.